The Colorado Department of Transportation has finished upgrading traffic signals at two intersections in Craig. Sturgeon Electric served as the contractor for this project.
At the intersection of Highway 40 (West 4th Street) and Ranney Street, the improvements include new pedestal poles equipped with pedestrian push buttons and video detection equipment. These additions are intended to improve the efficiency of the traffic signals.
Work on both traffic signals located on US 40 and CO 13 is now complete.












