Eastbound US 50B at I-25 interchange in Pueblo closed for weekend drainage work

Shoshana M. Lew, Director
Shoshana M. Lew, Director - Colorado Department of Transportation
0Comments

Motorists in Pueblo will face a temporary closure of eastbound US Highway 50B this weekend. The Colorado Department of Transportation (CDOT) and its contractor, SEMA Construction, are undertaking drainage improvements as part of the Interstate 25 and US 50B Interchange project. This work involves installing new pipes beneath the eastbound lanes.

The closure affects eastbound US 50B between I-25 and Hudson Avenue/Bonforte Boulevard. According to CDOT, the measure is necessary to ensure public safety during construction.

A detour will be in place for drivers traveling east on US 50B. Motorists are advised to use northbound I-25, take the US 50B/CO 47 off-ramp, and continue east on CO 47 (Exit 101) to access US 50.



Related

Kate Greenberg Commissioner

Colorado highlights inspection efforts during Weights and Measures Week

Governor Jared Polis has declared March 1-7 as Weights and Measures Week in Colorado, aligning the state with a nationwide campaign to emphasize the importance of accuracy in commercial transactions such as purchasing fuel or groceries.

John W., Lottery Winner

Arvada resident wins $10,000 on Broncos Orange Cash Scratch ticket

John W. from Arvada has won $10,000 after purchasing a Broncos Orange Cash Scratch ticket at the ER Store Conoco in Westminster, Colorado.

Jessie B., Traffic Control Supervisor

Brighton resident wins $10,000 on Ruby 8s scratch ticket

Jessie B., a traffic control supervisor from Brighton, Colorado, won $10,000 after purchasing a Ruby 8s Scratch ticket at the Kum & Go Maverick located at 2150 E. Bridge Street.

Trending

The Weekly Newsletter

Sign-up for the Weekly Newsletter from Centennial State News.